Call for price
Aircraft Location:São Paulo, São Paulo, Brazil
Seller Information
View Seller InformationGeneral
Year
2000
Manufacturer
Model
Condition
Used
Description
*** FOR SALE IN BRAZIL ONLY ***
Aircraft based and registered in Brazil.
All maintenance current – Engines and propellers overhaul done in 2025.
Landing Gears and FCU’s overhauled in 2025.
New windshields, Battery, De-ice boots and tires installed.
Retrofited Cockpit Garmin G1000.
Paint and interior in good condition.
Executive interior configured for 9 passengers + 1 pilot.
No accident or incident history.
Always kept in hangar.
Only 2 owners and 2 crew since new.
Approved RVSM.
Airframe
Total Time
3,400
Complete Logs
Yes
Landing Gear Overhaul
Yes
Winglets
Yes
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-60A
Engine 1 Time
3,400 SNEW
Engine 1 TBO
3600
Engine 1 Notes
Overhaul done in 2025.
3,600 remaining hours.
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PT6A-60A
Engine 2 Time
3,400 SNEW
Engine 2 TBO
3600
Engine 2 Notes
Overhaul done in 2025.
3,600 remaining hours.
Props
Prop 1 Time
3400 SNEW
Prop 2 Time
3400 SNEW
Number of Blades
4
Prop Notes
Overhaul done in 2025.
Avionics
Avionics/Radios
Garmin G1000 Avionics Suite
Auto pilot Garmin GFC 700
Garmin TCAS
Garmin Weather Radar
Garmin Digital Engines Monitor
Garmin Radios VHF/NAV/COMM
Garmin Digital Transponder
Stand by Instruments
Additional Equipment
Additional Equipment
Chart View
Air Conditioning
Read Lights
Tables
Cargo Net
Winglets
Inspection Status
Inspection Status
All maintenance current – Engines and propellers overhaul done in 2025.
Landing Gears and FCU’s overhauled in 2025.
New windshields, Battery, De-ice boots and tires installed.
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

