Call for price
Aircraft Location:Raleigh, North Carolina
Seller Information
View Seller InformationGeneral
Year
2018
Manufacturer
Model
Serial Number
45-563
Condition
Used
Description
Engines Enrolled on MSP
APU Enrolled on MSP
Garmin G5000 with Phase III Upgrade
Recent 96 Month Gear Inspection
Cabin Pocket Doors
One US Based Owner
Gogo Avance L3 Internet
9 Passenger Configuration
Airframe
Total Time
1,440
Total Landings
1,719
Maintenance Tracking
CAMP
Airframe Notes
Home Base United States
Certification Currently Operated – FAR Part 91
Engine Program
Engine Maintenance Program
MSP
Engine 1
Engine 1 Serial Number
P137346
Engine 1 Time
1,440 SNEW
Engine 1 Cycles
1,691
Engine 1 Notes
Honeywell TFE-731-40BR-1B
Engine 2
Engine 2 Serial Number
P137345
Engine 2 Time
1,440 SMOH
Engine 2 Cycles
1,691
Engine 2 Notes
Honeywell TFE-731-40BR-1B
Auxiliary Power Unit
APU
Yes
APU Notes
Honeywell RE-100
Serial Number P-601
APU Total Time Since New 529 Hours
Program Coverage MSP
Avionics
Avionics/Radios
The Bombardier Learjet 75 is equipped with an integrated Garmin G5000 Avionics Suite.
Exterior
Exterior Notes
Base Paint Color(s) White
Stripe Color(s) Blue
Last Painted Date Original
Interior
Interior Notes
Number of Passengers Eight (8) + One (1) Belted Lav
Galley Location Forward
Forward Cabin Configuration Four (4) Place Club
Aft Cabin Configuration Four (4) Place Club
Lavatory Location(s) One (1) Aft Belted
Last Refurbished Date Original
CONNECTIVITY
Internet Gogo Avance L3
Inspection Status
Inspection Status
Inspection Last Performed Next Due
600 Hour / 36 Month March 2024 February 2027
1200 hour / 72 Month March 2024 February 2030
2400 Hour / 108 Month February 2018 February 2027

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

