Call for price
Aircraft Location:Guatemala City, Guatemala, Guatemala
Seller Information
View Seller InformationGeneral
Year
2018
Manufacturer
Model
Serial Number
208B-5492
Condition
Used
Registration #
N2069W
Description
Textron Aviation is pleased to present this 2018 Grand Caravan EX on behalf of the aircraft owner.
Airframe
Total Time
1,866
Total Landings
1,866
Engine Program
Engine Maintenance Program
ESP Gold
Engine 1
Engine 1 Time
1,866 SNEW
Engine 1 TBO
4000
Engine 1 Cycles
1,866
Props
Prop 1 Time
1866 SNEW
Avionics
Flight Deck Manufacturer/Model
GARMIN G1000 NXI
Avionics/Radios
STANDARD EQUIPMENT:
– Garmin G1000 NXi Avionics
– Garmin GIA 63W Dual Integrated Avionics Unit Includes Nav/Com/GPS
– Dual Attitude and Heading Reference System
– GFC-700 Automatic Flight Control System
– Garmin GTX 335 Transponder with ADS-B Capability
– Garmin Flight Stream 510
– Crew Alerting System
– Standby Instrumentation
– Artex ME-406 ELT
– Engine Indicating System
– Maintenance Diagnostics
Additional Equipment
Additional Equipment
OPTIONS INSTALLED:
– TKS Ice Protection – Radar
– ADS-B Out and In Functionality w/Single GTX 345
Transponder
– Garmin TAWS-B
– Jeppesen Chartview
– Garmin GTS825 TAS
– Garmin GWX70 – 4 Color Digital Weather Radar
– Air-conditioning, Cabin
– Aircraft Payload Extender STOL System
– Cargo Pod w/ Exhaust Deflector
– 17 Port Oxygen System
– Synthetic Vision Technology
– McCauley Propeller with TKS
– FA2100 CVDR
– Oversized Tires 29”
– Aero Twin Rudder Gust Lock
– Latin American Bi-Lingual Placards
Exterior
Year Painted
2018
Exterior Notes
Overall white with black base and orange stripes.
Interior
Year Interior
2018
Interior Notes
Canyon Interior Scheme installed.
CABIN:
– Cabin seating for 14 place Commuter

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

