Description
• U.S. based and registered • Low time • Recent 12/24/36-month inspection • Forward galley and forward crew rest • Starlink connectivity • Always Hangared • Engines on Rolls-Royce Corporate Care, APU on Honeywell MSP, avionics on HAPP • Head-Up Display (HUD) and Enhanced Vision System (EVS) • ADS-B Out, CPDLC, FANS-1/A, EVAS STCSpecifications
Year2008
ManufacturerGULFSTREAM
ModelG550
Serial Number5178
ConditionUsed
Total Time4,621
Total Landings1,591
Engine Maintenance ProgramRolls Royce CorporateCare
Engine 1 Make/ModelROLLS ROYCE BR710
Engine 1 Time4,621 SNEW
Engine 2 Make/ModelROLLS ROYCE BR710
Engine 2 Time4,621 SNEW
APUYes
APU Time3,149
APU Maintenance ProgramMSP
Avionics/Radios• Enrolled on Honeywell Avionics Protection Program (HAPP)
• Planeview Avionics Enhancement, installed by Jet Aviation Basel, Aug 2014
• CPDLC / ADS-B Out mandates package, installed by Jet Aviation Basel, Aug 2014
• FANS-1/A & CPDLC, installed by Jet Aviation Basel, Feb 2014
• Head-Up Display (HUD) · Enhanced Vision System (EVS) · EVAS STC
• Onboard Wi-Fi: Starlink
WifiYes
Exterior NotesUpper white, lower and accents in Dark Blue.
Number of Seats14
GalleyYes
Galley ConfigurationForward
Crew RestYes
Crew Rest ConfigurationForward
LavatoryYes
Lavatory ConfigurationForward and Aft
Interior NotesForward galley and forward crew rest compartment. Forward cabin: four
individual club chairs. Mid-cabin: two single club seats opposite a credenza. Aft cabin: dual opposing
four-place divans.
Inspection Status• Recently completed 12/24/36-month inspection
• 192-Month Inspection completed March 2024 at Gulfstream West Palm Beach
• 96-Month & 144-Month Inspections completed, Gulfstream West Palm Beach
• ASC 074 Dual Brake Metering Valve, Apr 2016
• ASC 112 Elevator Hardover Prevention (HOPS), Jan 2016
• ASC 116 Rev B NLG Elec Harness, Sep 2016
• ASC 911A-C / ASC 113A Planeview MOS upgrade, 2016 & 2020
• CB 122A Fuel Boost Pump replacement, Sep 2016
Year2008|
ManufacturerGULFSTREAM|
ModelG550|
Serial Number5178|
ConditionUsed|
Total Time4,621|
Total Landings1,591|
Engine Maintenance ProgramRolls Royce CorporateCare|
Engine 1 Make/ModelROLLS ROYCE BR710 |
Engine 1 Time4,621 SNEW |
Engine 2 Make/ModelROLLS ROYCE BR710 |
Engine 2 Time4,621 SNEW |
APUYes|
APU Time3,149|
APU Maintenance ProgramMSP|
Avionics/Radios• Enrolled on Honeywell Avionics Protection Program (HAPP)
• Planeview Avionics Enhancement, installed by Jet Aviation Basel, Aug 2014
• CPDLC / ADS-B Out mandates package, installed by Jet Aviation Basel, Aug 2014
• FANS-1/A & CPDLC, installed by Jet Aviation Basel, Feb 2014
• Head-Up Display (HUD) · Enhanced Vision System (EVS) · EVAS STC
• Onboard Wi-Fi: Starlink|
WifiYes|
Exterior NotesUpper white, lower and accents in Dark Blue.|
Number of Seats14|
GalleyYes|
Galley ConfigurationForward|
Crew RestYes|
Crew Rest ConfigurationForward|
LavatoryYes|
Lavatory ConfigurationForward and Aft|
Interior NotesForward galley and forward crew rest compartment. Forward cabin: four
individual club chairs. Mid-cabin: two single club seats opposite a credenza. Aft cabin: dual opposing
four-place divans.|
Inspection Status• Recently completed 12/24/36-month inspection
• 192-Month Inspection completed March 2024 at Gulfstream West Palm Beach
• 96-Month & 144-Month Inspections completed, Gulfstream West Palm Beach
• ASC 074 Dual Brake Metering Valve, Apr 2016
• ASC 112 Elevator Hardover Prevention (HOPS), Jan 2016
• ASC 116 Rev B NLG Elec Harness, Sep 2016
• ASC 911A-C / ASC 113A Planeview MOS upgrade, 2016 & 2020
• CB 122A Fuel Boost Pump replacement, Sep 2016|